Q.On tankers how to decide the topping off rate and the time when to reduce rate for topping off?

Answer 1 Answers
Inacio Fernandes

Depends on loading capacity of manifolds and valves. Minimum tanks or tank required to be kept open during loading operation.

Time depends on the minimum loading rate agreed by the terminal and experience of person in charge of operation.